- Government:
Click to enlarge
CEEPCO Contracting provided construction services for Alteration and Significant Repairs to USDA Bldg 062 – Agricultural Research Service in Beltsville, MD. Work included:
a) Thorough Investigation and Analysis of Existing Conditions. b) Replace and Repair Roof, Fascia, Gutters and Downspouts. c) Structural Evaluation of Foundation System to Repair and Prevent Exterior Water Damage. d) Painting.
e) Repair to Electrical System. f) Replace Overhead Doors.
Click to enlarge
Click to enlarge
Click to enlarge
Click to enlarge
Click to enlarge
Click to enlarge
- Education:
Click to enlarge
- Military:
Click to enlarge
Click to enlarge
Click to enlarge
CEEPCO has also provided services at the following military installations:
- Bolling AFB, DC
- Henderson Hall, VA
- Fort Meade, MD
- Fort Myers, VA
- Anacostia Naval Air Annex, DC
- Armed Forces, DC
- Healthcare:
Click to enlarge
- International:
Click to enlarge |
- USAID (Design-Build
Millet Bridge
- ): CEEPCO is presently performing on a design/build project to remove and replace the bridge over Ravine Millet between Petion-Ville and Tabarre. We are designing the: (a) architectural, geometrical and structural characteristics of the bridge and its approach roads; (b) upstream and downstream ravine channel dimensions, characteristics and all projected traffic volume and axle load characteristics; (b) pedestrian and non-motorized traffic demand; (c) the geotechnical, geological, hydrological, drainage and projected flow characteristics of the Millet Ravine; (d) construction and maintenance unit cost analysis and related budgets needed to implement and maintain the proposed new Millet Bridge; and (e) the schedule of construction implementation of the proposed new bridge, approach roads and its related ravine protection works. Upon approval of the construction documents by USAID and M-TPTC, CEEPCO will start demolition of the existing bailey bridge and construction of the new bridge.
Click to enlarge |
- USAID / CHEMONICS (HRI): Design-Build for Rehabilitation of
Gymnasium Vincent
- . Complete design, construction, and construction management associated with the work related to the complete rehabilitation of Gymnasium Vincent.
Click to enlarge |
- USAID (Civil Engineering Design and Environmental Assessment of
Caracol EKAM Site
- ) – USAID intends to build permanent housing, core houses, in the Cap Haitien Development Corridor in conjunction with the development of an industrial park. CEEPCO was awarded a contract by USAID to provide engineering and environmental services. Components of the engineering services, at a minimum, include the following elements: 1) Road layout, design and construction showing the basis for roadway widths, subgrade requirements and pavement design; 2) Water system design including the well system, controls, storage, stand by power, and the distribution system including kiosk design; 3) Drainage layout and design including erosion and sediment control and all relevant calculations; 4) Sanitation solution including all relevant calculations and training and other factors necessary to ensure sustainability; 5) Solid waste solution/disposal; 6) House pad preparation solutions; and 7) Final parcel identification solutions. CEEPCO is responsible for developing the Scoping Statement for the environmental analysis and completing the draft Environmental Assessment for the permanent settlements. CEEPCO will also provide geotechnical services and furnish a report on the results of the soil analysis when it is completed.
- Energy & Environmental:
Click to enlarge
Click to enlarge
- Science & Technology:
Click to enlarge
NIST Gaithersburg’s Building Research Facility (Bldg. 226) comprises of various office and lab spaces. CEEPCO was contracted to provide site preparation and installation of several emergency exit doors at the facility.